Pavement Rehabilitation Program

 

The entire road network is inspected on a three year cycle and each road is analyzed and rated. Roads selected for rehabilitation are those where the surface is rutted, cracked, graveled and generally in poor driving condition but without major structural defects. Typically, the pavement rehabilitation program involves milling and replacing the asphalt surface.  

Before replacing the top layer of asphalt, concrete curbs and gutters are repaired along with the sidewalks. Additional work includes adjusting the elevation of valves and manholes, replacing traffic detector loops, surface drainage swales and installing new lane markings.

The following pavement rehabilitation projects are planned for the 2020 construction season:

  • 78A Street: 50 (Gaetz) Avenue to 49 Avenue
  • 49 Avenue Crescent: 76 Street to 49 Avenue
  • 71 Street: 59 Avenue to Northey Avenue
  • 69 Street Drive: 59 Avenue to 71 Street
  • Piper Drive: 50 (Gaetz) Avenue to Pamely Avenue
  • 59 Avenue: 67 Street to Holt Street
  • Lane North of 52 Street: 53 Street to 52 Street
  • 52 Avenue: 43 Street  to end
  • 46 Street: 51 Avenue to 49 Avenue
  • Carpenter Street: Cornett Drive to end
  • 32 Street Westbound: 47 Avenue to Taylor Drive
  • 32 Street Eastbound: Taylor Drive to 47 Avenue
  • 50 (Gaetz) Avenue Southbound: 34 Street to 28 Street
  • 50 (Gaetz) Avenue Northbound: 36 Street to 30 Street
  • 51 Avenue: 32 Street to 50 (Gaetz) Avenue
  • 49 Avenue: 50 (Gaetz) Avenue to 32 Street
  • 49 Avenue / 33 Street: 50 (Gaetz) Avenue to 32 Street
  • 35 Street: Spruce Drive to 43 Avenue
  • 35 Street Crescent: 35 Street to 35 Street
  • Ironstone Drive: Inglewood Drive to 30 Avenue